Miten Tee ammattilaiset suorita päivittäinen suojaus ja huolto sähkö laitteet % 3f % 3aKorkea ja matala jännite teho muunnos ja jakelu laitteet (3)

Jan 03, 2024

Jätä viesti

   https://www.kaichuanpower.com/

1 Tee a hyvä työ sisään kosteudenkestävyys korkea jännite jakelu huone ja pidä laitteet sisään hyvä käyttö kunto.

    There are also problems of heavy moisture and high humidity in the high-voltage distribution room of the substation. The following measures should be taken to prevent moisture in the high-voltage distribution room. The first is to seal cable trenches and switch cabinet holes. Waterproofing and sealing measures should be adopted for the cable trenches entering and exiting the high-voltage distribution room to ensure that the cable trenches in the high-voltage distribution room are isolated from the inside and outside, and to prevent water in the cable trench from flowing into the high-voltage chamber. At the same time, the cable penetrations in each power distribution cabinet are blocked to prevent moisture from the cable trench from directly intruding into the switch cabinet equipment in the high-voltage room. The second is to inspect the indoor roof of the high-voltage power distribution room to ensure there is no leakage. At the same time, the busbar is exposed in the high-voltage chamber on the top of the cabinet. It is not advisable to use lime paint on the inner layer of the roof to prevent the lime layer from falling off due to moisture and falling on the top of the switch cabinet. The third is to install an industrial dehumidifier with power that matches the size of the indoor space to dehumidify the indoor air.

       2 Merkki hätä suunnitelmat onnettomuuksien varalta ja vahvistata hallinta.
Relevant departments must be aware of risks, conduct plan analysis for various possible power failures, and formulate corresponding emergency measures. Reasonable and clear organizational arrangements enable relevant personnel to respond quickly to the accident as soon as it occurs, take all measures to minimize the losses caused by the accident, and repair the equipment in a timely manner. In addition, in order to facilitate the staff to clean up and investigate after the accident, the order of the distribution lines must be fixed in an eye-catching place in accordance with relevant regulations. In normal work, the quantity of materials stored should be determined based on the operating status of the power equipment, and it must also be ensured that the reserve amount of materials can meet the requirements of the power supply station. Under normal circumstances, the optimal amount of materials stored is generally three months. In order to make it easier to pick up and put back, staff should arrange every item in the warehouse neatly and mark it with corresponding signs.

Lähetä kysely